Work Zones play a crucial role in specifying job sites, communicating construction activities to the Work Zone Data Exchange, and enhancing safety measures for the traveling public.
Accessing Work Zones:
- Start by accessing a Project from the Today Page.
- At the top of the page, locate the round bubbles providing quick slide access to various functions within the selected project.
- Select "Work Zones" to get started.
- The count in the bubble displays the total active work zones in the project.
Creating a Work Zone:
- Tap on "Create Work Zone" to begin the setup.
- Follow the prompts and enter required information such as the road name, type of road event, and its direction.
- Tap the information bubble for detailed definitions of available options.
- Specify the work boundary by interacting with the map. Drop pins along the work zone route and make adjustments as needed.
- Tap "Finish" when satisfied and then select "Create Work Zone" to save your work.
Managing Work Zones:
- In the Settings Tab, view a list of created Work Zones for the project.
- Scroll through the list to arm or disarm individual transmissions.
- Quickly disarm all work zones from the bottom.
- Access additional options by tapping the three dots menu button to Edit, View, or Delete a Work Zone.
- Add new Work Zones by tapping the Plus sign at the top right corner.
Live Map View:
- Navigate to the Live Map tab to see a live view of all work zones on the map.
Additional Content:
We've also included a video detailing the steps above: